From Above: August 31

A milestone was achieved this past month when the structural steel framing for the library and arts center reached completion.  This milestone was commemorated with a “Topping Out” event which is typically acknowledged in the construction industry when steel framing is complete and other trades can begin their work.  Metal decking has been installed on the second floor of the library and the perimeter block wall for the site is substantially complete.